ENTEKSIstanbul · Since 2006

Manufacturing process

Eight steps, one accountable team.

A clear path from your tech pack to finished goods — with samples in 7–10 days and no hand-offs to subcontractors you have never met.

  1. 01

    Brief & Costing

    Sketch, tech pack or reference garment in. Fabric options, trims and a transparent price out.

  2. 02

    Pattern & Proto

    Blocks drafted or corrected, first prototype sewn in the sample room.

  3. 03

    Fit & Approval

    Fit sessions, comments applied, size set graded and approved before bulk.

  4. 04

    Fabric & Trims

    Bulk fabric and trims booked, inspected and reserved per order.

  5. 05

    Cutting

    Marker planning on Gerber, spreading, cutting and bundling with shade control.

  6. 06

    Sewing

    Dedicated lines per style, inline quality checks at every critical operation.

  7. 07

    Wash & Finishing

    Wash, treatment, pressing, trims and labelling to the approved standard.

  8. 08

    QC & Shipment

    Final inspection, measurement report, packing to your manual, ready to ship.

Cut denim parts stacked on the cutting table
Overlock machine and thread cones on the sewing line